Skip to content
Back

Services

When technology decisions affect live operations.

I test the assumptions behind proposed changes, design architectures and transition paths that fit the existing estate, and take responsibility for delivery where needed. The starting point is not the preferred technology. It is the business system that still has to work afterwards.

01 — Architecture & Change Impact Review

When to buy it

A replacement, migration, integration or new AI/engineering technology is up for decision. It is unclear whether the relevant business rules, dependencies, operational risks and alternatives are sufficiently understood.

What is included

  • One specific, scoped architecture or change decision; not a full enterprise inventory.
  • Two conversations with named business and technical owners.
  • Review of the relevant system and process documentation provided, plus agreed additional read-only artefacts where available.
  • Review of the load-bearing assumptions, known dependencies, change impacts and operating conditions within the agreed system scope.
  • Assessment of realistic alternatives: do not change, simplify, integrate an existing solution, modernise, use AI — where it makes sense.
  • Evidence labelling: proven, confirmed by stakeholders, assumption, open.
  • Risks, open validations, owners and the next decision or delivery step.
  • Executive results session of 60–90 minutes.

Prerequisites

  • A named sponsor
  • A named business contact
  • A defined decision question
  • Available documentation and lawfully accessible data and artefacts
Duration
10 working days from kickoff
Format
Remote; results session remote or on site
Fixed fee
from 8,500 € net
Result
Architecture & Change Decision Record (approx. 10–15 pages) + executive one-pager

For a clearly bounded subject; binding quote after the introductory call. Payment: 50 % on engagement, 50 % on delivery.

No complete system mapping, no full review of every interface, no legal or certification review, no production approval and no implementation. Extensions are agreed in advance.

Result

A reasoned Architecture & Change Decision Record with an executive one-pager, alternatives, known impacts, open assumptions and a go/no-go or a conditional decision frame.

What is measured

Four axes

  1. Business process and operations

    Which process has to keep working, including its exceptions, and what an outage costs.

  2. Does the alternative hold?

    Whether keeping, simplifying, integrating, modernising or AI carries the task — and which solution carries it better.

  3. System estate and dependencies

    Which data, interfaces, boundaries and operational resources a viable change requires.

  4. Evidence, approval and accountability

    What must be proven before someone signs off, and who signs.

Outcomes

What you hold at the end

  • Architecture & Change Decision Record
  • Executive one-pager
  • Assessed alternatives with known impacts
  • Assumptions and evidence, labelled per statement
  • Go/no-go or a conditional decision frame with the next step

What a decision record looks like.

Not a slide deck of general recommendations, but a traceable basis for a decision: what is known, which alternatives exist, what must be resolved before sign-off?

Architecture & Change Decision Record

AI agent in ERP order processing

Illustrative sample – fictional scenario, not a client reference or a completed review.

Decision question

May an AI agent make order changes in the ERP on its own?

Preliminary recommendation · Conditional go

Conditional go for a read-only, assisting pilot. No approval of autonomous write access until business exceptions, permissions and control mechanisms are sufficiently validated.

Alternatives considered

  1. 01Continue the existing process unchanged.
  2. 02Use AI assistance without write access to the ERP.
  3. 03Enable agentic processing with controlled write permissions.

Decision-relevant uncertainty

In this fictional scenario, the completeness of the business exception rules has not been demonstrated.

Evidence class: Open

Conditions for approval

  • Validate business rules and exceptions.
  • Define write permissions and decision accountability.
  • Demonstrate logging and fallback procedures.
  • Obtain business and technical sign-off.

Next step

Define a scoped read-only pilot with process and platform owners.

View a sample decision record →

  • 02 — Platform & Transformation Architecture

    Once the decision is made, I design and guide the path through the existing system landscape: architecture boundaries, data and interfaces, integration and transition steps, cutover, fallback conditions, observability and technical release criteria. Where needed I steer delivery together with the existing teams and suppliers.

    Typical mandates

    • ERP, logistics and data integrations and system replacements.
    • Cloud and platform migrations with transition during live operations.
    • Enterprise and embedded platform decisions and supplier integration.
    • New AI-assisted and agentic engineering capabilities within existing SDLC and CI/CD structures.

    Results and duration depend on scope; no standardised completion within a fixed period.

    Architecture / initial mandate from 15,000 € net, scope by agreementDiscuss an architecture mandate
  • 03 — Technology & Engineering Leadership

    I lead IT and engineering organisations for a fixed term: technology direction, engineering delivery, clear decision rights and teams that decide for themselves. Architecture decisions and moving critical projects into operation remain part of the job. I am equally open to a permanent role.

    A direct interim engagement does not require a prior assessment.

All prices net. The entry point for all three forms is the same 30-minute introductory call.

Specialisation

Special case: AI-assisted software development in an existing estate

Coding agents can speed up development. Whether they can be used safely and sensibly in an existing engineering organisation depends on context, repository and CI/CD structure, permissions, independent review and clear decision rights.

Agentic Engineering Readiness

Question
Is our engineering organisation ready for coding agents, and what is missing before the next level?
For
CTO, Head of Engineering, platform and architecture leads
Scope
Two interviews, engineering leadership and one team. One repository, plus read access to CI and the existing agent configuration.
Result
Maturity level against the Agentic Engineering Standard, my own draft, open on GitHub, not a certification. Plus gaps per requirement, a 90-day path and a go/no-go for the pilot.

Duration, format and fixed fee as for the review: 10 working days, from 8,500 € net.

Agentic Engineering: the standard →The instruments →

AI Opportunity Signal: an automated first signal in a few minutes, not a review

Specialisation

Special case: architecture across many repositories

Code is getting cheap. What becomes scarce is the order above it: who may deviate from the standard, whether every repository runs on your own paved road, and whether your systems belong together or merely sit side by side.

Architecture frame review

Question
How do our repositories, teams and systems hang together, and what role does the person accountable for that need?
For
CTO, Head of Engineering, platform and architecture leads
Scope
Two conversations with platform and team owners. One scoped slice of your repositories, read-only, in your environment.
Result
State per artefact (canon, outdated, drift, standalone), findings with evidence class, one evidenced architecture diagram of the slice, a decision paper with alternatives. Plus a proposal for the architect's role and decision rights.

Duration, format and fixed fee as for the review.

The thinking behind it: architecture frame →

How a decision is tested

What I don't sell as fact.

Evidence classMeaning
ProvenSupported by accessible artefacts, operational data or a reproducible check
ConfirmedMade plausible by named accountable people, not yet independently checked
AssumptionUsed for the assessment, but still to be validated
OpenMissing evidence or an unresolved dependency

A review may end with “not yet ready for decision”. That is a result too — and often the more responsible decision than a premature pilot or migration.

Terms

Scope protection

  • The 30-minute introductory call qualifies the initiative. It is not a free architecture or process analysis, and a no is possible.
  • A review covers one decision question, two conversations and one results session; in the agentic engineering special case, one repository with one team.
  • Every extension – further questions, conversations, deep-dives, implementation – is agreed in advance as a change request.
Motion note

The order was already there

Between the points lies more order than a first look gives away.

The frame closes for a moment.

Then all that remains is whether it holds.